• Info needed.

 

 


Metering Station Project

  • Lanmark created a template design for 2-1610 meter skid
  • The 2-16104U will include NPS 16 yard piping, 2 runs of NPS 10 Ultrasonic Meter run. 
  • Complete GA layout for new meter skids and separator building
  • New skid design for meter skids and separator building
  • Incorporated long radius bends
  • 54” OD x 8’ SS Vertical Separator
  • Skid Mount Instrument Building
  • H2S Analyzer
  • Two 16” OD x 50’ sour bottles
  • Dual hot tap tie-ins to NPS 24” Simontte Lateral Loop Lines

 

 


Metering Station Project

  • 10” yard piping with 6” ultrasonic meter
  • Dual hot taps into 42” and 30” Edson Mainline/Loop
  • 200 meter pipeline that crossed 4 large diameter pipelines
  • The site has a design capacity of 3016 e3m3/d

Metering station Project

  • The 2-1284U will include NPS 12” yard piping and NPS 8” Ultrasonic Meter run. 
  • Dual hot tap tie-ins to NPS30/42 Edson Mainline/Loop Lines.
  • The facility was designed for a MOP of 8450 kPa.
  • Design capacity of 3136 e3m3/d.